Issue Traceability in Requirements
In the Requirements module, the issues tab displays issues linked to the requirement either directly or indirectly through the execution of associated test cases.
Direct Linkage column
For issues linked from test execution (i.e. issue linked while execution of the test case to which the requirement is associated), the Direct Linkage shows “No”.
For issues directly logged with the requirement, Direct Linkage shows “Yes”.
Issues linked with the test case without execution, and this test case is associated with the requirement, then the Direct Linkage shows “No”.
Jira issues are linked to the requirement only if the Requirement module is synced with a Jira issue type.
Only directly linked issues can be unlinked using the Unlink icon on the Issue tab.
Issues linked from executions can be unlinked from the execution screen.
Execution column
The Execution column in Issues tab shows the number of test executions linked to the issue.
Clicking the count opens the Execution Runs with execution details of the issue.
The Linkage Level column indicates if the issue is linked at the test case or test step level.
When Jira is integrated with
Issue linked during execution appears in the Issues Link section of Jira. It may take up to 15 minutes to reflect in Jira.
The issues logged with requirements appear in the Issues Link section of the story in Jira.
Unlinking the issue from , removes the Jira issue link.
Deleting the Jira issue link removes the issue link from the Jira story. It does not get unlinked or deleted from .